Deployment pipeline

From Domain to Deployed Experience.

The pipeline is the ordered path from intent to verified infrastructure. Each stage has a status, an owner and a trace entry.

ARCHITECTURE / DEPLOYMENT PREVIEW
DEFINECONFIGUREBUILDDEPLOYVERIFYOBSERVEOPERATE
  1. 01PLAN
  2. 02RESOLVE NAMESPACE
  3. 03RESOLVE NODE
  4. 04LOAD CONFIGURATION
  5. 05LOAD TEMPLATE
  6. 06LOAD RECORDS / DATA
  7. 07LOAD GRAPH CONTEXT
  8. 08LOAD SURFACE MANIFEST
  9. 09VALIDATE
  10. 10BUILD
  11. 11APPROVE RELEASE
  12. 12DEPLOY
  13. 13VERIFY
  14. 14OBSERVE
  15. 15REGISTER WITH GRID
  16. 16REGISTER RELATIONSHIPS
  17. 17HAND OFF TO USA OS

Possible statuses

QUEUEDPREPARINGVALIDATINGBUILDINGAWAITING APPROVALDEPLOYINGVERIFYINGOBSERVINGSUCCESSFAILEDROLLED BACKCANCELLEDARCHITECTUREPREVIEW
pipeline run — TRACE-20260911-000184
[14:02:10] PLAN                 queued
[14:02:12] RESOLVE NAMESPACE     NS-GEO-US-MN-DULUTH
[14:02:14] RESOLVE NODE          NODE-US-MN-DUL-014
[14:02:18] LOAD CONFIGURATION    CFG-CITY-MN v12
[14:02:21] LOAD TEMPLATE         TPL-CITY v8
[14:02:29] LOAD RECORDS          BR-88213 IR-11902
[14:02:33] LOAD GRAPH CONTEXT    GCTX-v6
[14:02:36] LOAD SURFACE MANIFEST SMF-CITY-0042
[14:02:44] VALIDATE              passed
[14:03:02] CALCULATE PLAN        PLN-000184 (5 change · 1 add)
[14:04:10] BUILD                 REL-14-build.3
[14:04:25] APPROVE RELEASE       policy:human-approval
[14:05:31] DEPLOY                SRF-US-MN-DUL-CITY-001
[14:06:12] VERIFY                15 checks (preview)
[14:06:38] OBSERVE               actual == desired
[14:06:39] REGISTER WITH GRID    NODE-US-MN-DUL-014
[14:06:40] REGISTER RELATIONSHIPS 4 edges
[14:06:41] HAND OFF TO USA OS    observing
INTENTPLANGOVERNEXECUTEPROVEOBSERVEOPERATE

Intent → Plan → Govern → Execute → Prove → Observe → Operate

Canary deployment

Test Small. Verify. Scale.

A new template version reaches one node first. Only verified, observed health expands the deployment group.

  1. 01CHANGEA new template or configuration version
  2. 02DEPENDENCY ANALYSISWhat does this depend on?
  3. 03BLAST RADIUSWhat could this affect?
  4. 04CANARY TARGETOne node first
  5. 05DEPLOYExecute the plan
  6. 06VERIFYEvidence required
  7. 07OBSERVEActual state
  8. 08HEALTHY?YES → expand group · NO → stop / review / rollback

Healthy?

YES → EXPAND DEPLOYMENT GROUP

NO → STOP / REVIEW / ROLLBACK

CHANGEDEPENDENCIESBLAST RADIUSCANARYEXPAND